SHINKO ELECTRIC INDUSTRIES CO., LTD.
Search by Product Name
Search by Application
The Shinko Way
Based on the Company-wide Disaster Prevention Guidelines and Business Continuity Management (BCM), Shinko prepares for the occurrence of natural disasters, and implement measures and training to minimize environmental risks in the event of unforeseen circumstances.
In response to the frequent flood damage caused by heavy rains and typhoons in recent years, Shinko has implemented flood control measures, after referring to hazard maps. We installed waterproof barriers to stop the flow of water as a measure against indoor flooding. In addition, outdoor equipment is raised on platforms so that even if water damage does occur, it will be minimized.
Seismic reinforcement work for buildings of Shinko built under the old earthquake-proofing standards has been completed at all plants, and seismic reinforcement work for rooftop facilities (piping and ducts) is currently underway in sequence.
As part of the business continuity planning, Shinko installed emergency power generators at all plants in case of a largescale blackout due to an accident or disaster, ensuring power for lights, fire alarm systems, and other equipment during a blackout.