Anniversary Mark 新光電気工業株式会社
Japanese

History

  1. 2006

    • Consolidated the research and development department at the SHINKO R&D Center.
  2. 2007

    • Received the Next-Generation Approval Mark based on the Act on Advancement of Measures to Support Raising Next-Generation Children.
  3. 2008

    • Nagano Prefecture Governor, Jin Murai, visits the Wakaho Plant.
  4. 2009

    • Embarked on joint development of a high-speed ASIC substrate with IBM.
  5. 2010

    • Established the SHINKO Way.
  6. 2011

    • Named Fumio Kuraishi the 9th President and Representative Director.
  7. 2012

    • Supported the 50th National Skills Competition and 33rd National Abilympics as a Gold Sponsor.
    • Leadframe Division gains ISO/TS16949 certification.
  8. 2013

    • Began applying the Global Business Standards (GBS).
  9. 2014

    • Named Mitsuharu Shimizu the 10th President and Representative Director.
  10. 2015

    • IC Assembly Division gains ISO/TS16949 certification.
    • Kurita Sogo Center receives the 28th Nagano-City Landscape Award.
  11. 2016

    • Transited to the structure of a company with audit and supervisory committee.
  12. 2017

    • Moved the production engineering department to the SHINKO R&D Center.
    • Named Noriyuki Toyoki the 11th President and Representative Director.
    • Announced a joint Labor - Management Declaration on Transforming Work Styles.
  13. 2018

    • Gain ISO9001 integrated certification for the entire Company shifting from separate certifications in each manufacturing division.
    • Received the Grand Prize in the Fujitsu Group Environmental Contribution Awards.
  14. 2019

    • Named Masami Fujita the 12th President and Representative Director.
  15. 2020

    • Introducted a remote work system.
    • Concluded the Comprehensive Partnership Agreement with the Faculty of Engineering, Shinshu University.
  16. 2021

    • Opened the SHINKO Techno Academy in Oshimada, Nagano-City (within Kohoku Plant).
    • Named Susumu Kurashima the 13th Representative Director of Board, President.
  17. 2022

    • Moved to the Prime Market due to the restructuring of the Tokyo Stock Exchange market.
    • Established the Environmental Vision 2050.
  18. 2023

  19. 2024

    • Sponsorship of Signature Pavilion "null²" at Expo 2025 Osaka, Kansai, Japan.
    Pavilion “null²” ©2024 Yoichi Ochiai / Design:NOIZ / Sustainable Pavilion 2025 Inc. All Rights Reserved.
  20. 2025

    • The Tender Offer by JICC-04, Ltd. for the Company’s Common Shares was Completed.
    • Delisted from the Prime Market of the Tokyo Stock Exchange.
    • Transited to the Structure of a Company with an Audit and Supervisory Board.
    • Completed an Absorption-type Merger with JICC-04, Ltd. as the Surviving Company and JICC-04, Ltd. Changed its Name to SHINKO ELECTRIC INDUSTRIES CO., LTD.